Sponsored by:
Texas Association of Environmental Professionals (TAEP)
TAEP is the premier organization for environmental
professionals in the State of Texas. The goals of TAEP include
the advancement of the environmental profession and the
establishment of a forum to discuss important environmental
issues. TAEP members receive a 10% discount. Please call
713.522.6300 for the code.
Published: 2024
Authors: John H. Zimmerman, Alan Williams, Brian Schumacher, Chris Lutes, Laurent Levy, Gwen Buckley, Victoria Boyd, Chase Holton, Todd McAlary, Robert Truesdale
Abstract
Subslab soil gas (SSSG) samples were collected as part of an investigation to evaluate vapor intrusion (VI) into a building. The June 2015 Office of Solid Waste and Emergency Response (OSWER) VI Guide (U.S. Environmental Protection Agency [U.S. EPA] 2015) does not provide specific, detailed recommendations regarding how to collect SSSG samples. The data collected in this study will be used to provide input into future OSWER VI Guidance documents on SSSG sample collection. To this end, three different types of subslab sampling ports were constructed with various sampling techniques within a hexagon-shaped grid in near proximity to each other. Conventional-, Vapor Pin-, and California-style ports were established in duplicate for continual analysis by onsite gas chromatography-electron capture detection (GC-ECD). Triplicate ports were established to evaluate active and passive long-term sampling methods to determine short range temporal differences. Active sampling methods included evacuated stainless-steel canisters fitted with capillary flow controllers (Modified U.S. EPA Method TO-15 [U.S. EPA 1999a]) and sorbent tubes collected using a syringe (Modified EPA TO-17 [U.S. EPA 1999b]). The Passive sampling method used was sorbent tube samples collected following the EPA TO-17 sampling method (Modified). This study did not identify any systematic differences in sample results between conventional, Vapor Pin, and CA-style probes for used in SSSG sampling. The decisions for site management would probably be the same for data from any subslab port style, active or passive sampling techniques over durations less than 2 weeks.